Menu
|
|
MANMAN/HP
Training: |
|
Logo
|
|
System Manager
Training Course:
Two Level MPS:
Pre-requisites: To have completed either
the detailed Manufacturing or Advanced MPR/MPS Course.
What is two-level
MPS?
Two-level MPS is an advanced planning
function within MANMAN/MFG. It allows the user to forecast
demand for products that are best planned as families.
Two-level MPS relies on mathematical
ratios between the product family and the variants that the
company actually sells, (for example, 15% of all Ford Fiestas
sold were 1.3GL models). Two-level MPS contrasts the expected
forecast ratio of the related products with the actual history
of products sold, it then responds to any change in market
demand by recommending corrective action to the planner
|
Training Period &
Details |
|
Day 1 |
-
Defining Product
Families
-
Two-Level MPS concepts,
including forecasting, production plans,
available-to-promise and family links
-
Two-Level MPS using
Configurable Parts in MANMAN/OMAR
-
Running Two-Level MPS -
Workshop
|
|
|
|
|
|
|
|
Footer
 |
©
2008 Baillie Associates Ltd. 50 Main Street, Lowdham,
Nottingham NG14 7BE Tel: +44 [0]115 966
3929 Fax: +44 [0]115 966 4745 |
 |
|
|
|
|
|
 |
 |